Valve Maintenance Checklist for Plant Operators

November 11, 2026

Most valve failures start with a lack of exercise, not with wear.

Monthly

Operate every isolation valve through a full stroke, then return it to its normal position. Record the torque feel and any noise.

Quarterly

Check stem packing for leaks, grease lubricated plug valves, and clean strainer screens. Replace screens that are distorted rather than washing them.

Annually

Pressure test safety-related valves, inspect seat leakage on critical isolation points, and re-torque bonnet bolts to specification.

Spares to keep

Gaskets, packing rings, seat rings and a spare handwheel for each valve size on site. Lead time on a single gasket is the most common cause of extended downtime.

Ask an engineer