Valve Maintenance Checklist for Plant Operators
Most valve failures start with a lack of exercise, not with wear.
Monthly
Operate every isolation valve through a full stroke, then return it to its normal position. Record the torque feel and any noise.
Quarterly
Check stem packing for leaks, grease lubricated plug valves, and clean strainer screens. Replace screens that are distorted rather than washing them.
Annually
Pressure test safety-related valves, inspect seat leakage on critical isolation points, and re-torque bonnet bolts to specification.
Spares to keep
Gaskets, packing rings, seat rings and a spare handwheel for each valve size on site. Lead time on a single gasket is the most common cause of extended downtime.